
Home
416201680
1976
Maple Grove, MN 55311 United States
mgfra.org
TwinCitiesFireWire
Podobné organizace
Thompsontown Volunteer Fire Company |
|
Spring Mill Fire CO No 1 |
|
Mortlake Fire Company of Brooklyn Connecticut Inc |
|
Tyler Mountain Volunteer Fire Department Inc |
|
Glen Haven Area Volunteer Fire Department |
Podobné organizace global
AIRFIELD VOLUNTEER FIRE SERVICE |
|
SOUTH EAST FIRE AND RESCUE |
|
OAKHILL AND DISTRICT FIRE DEPARTMENT |
|
SASKATCHEWAN VOLUNTEER FIRE FIGHTERS ASSOCIATION INC |
|
Perth Concert Band Incorporated |
More from Maple Grove
TOPLINE FINANCIAL CREDIT UNION |
|
INSURANCE FEDERATION OF MINNESOTA |
|
MUSICIANS IN DEBUT INTERNATIONAL |
|
MAPLE GROVE YOUTH FOOTBALL ASSOCIATION |
|
PRENATAL PARTNERS FOR LIFE INC |
Similar social media (15000)
City Theatre Company, Inc.15006 |
|
Friends of the Pittsburgh Urban Forest15009 |
|
Balkan Cultural Center15002 |
|
LA ON CLOUD915009 |
|
Nebraska State Education Association15009 |
News

Wednesday afternoon, St. Paul dispatched companies to a dwelling fire on the 600 block of Eustis Street. Ladder 23 arrived and reported they had a 1-story home with heavy fire on the deck on Side C. Engines 3 and 14 took the alley and both pulled their lines. Chief 1 took command and Ladder 23 searched the home while Engine 5 got a water supply to 3's and 14's. Chief 2 was safety. Crews quickly knocked down the deck fire and began overhaul. Crews found no extension in the home and all searches were negative. Assignment: Engines 3, 14, 5, 23, Ladders 23, 18, Squad 2, Chiefs 1, 2, Car 5, Medic 37 and Ambulance 1 (fb)

Saturday around 5:30 p.m., Minneapolis dispatched a first alarm assignment to the 1800 block of Talmadge Street SE for a structure fire. Engine 11 was first-in and reported heavy fire from the top floor of a 2 1/2-story duplex. Engine 19 laid a supply and backup line, Ladder 9 began a search, Chief 5 assumed command and Engine 15 was RIT. Command had Engine 19 hit some exterior fire before backing up 11's. Ladder 7 and 3 assisted with searches and Chief 3 was ISO. Engine 11 reported they had the main fire knocked down but needed truck crews to assist with extensive overhaul on the top floor. All searches were clear and crews rotated through assisting with overhaul. First alarm: Engines 11, 19, 15, Ladders 9, 7, 3. Chiefs 5, 3 and Deputy, MC, Salvage and HCMC medics (fb)

Poslední diskuze
Nearby
23
40
4.5
Maple Grove
About the organization
- M24 -
Sorry this product is unavailable. Please choose a different combination. Maple Grove Firefighters Relief Association Home Monthly General Membership Pull Tab Meeting Meeting dates times and locations are listed in Upcoming Events section. We look forward to see you at the next meeting.
Fire Prevention/ Protection/Control